HVAC energy compliance

Manual J/S/D and ResCheck,
priced flat.

The energy compliance documentation your building permit requires — prepared by the same team that pulls permits across Arizona every week. No hourly billing, no surprise line items.

Pricing

Two reports. Two prices.

That's the whole menu. If your project falls outside these, tell us about it and we'll quote it.

Most requested

Manual J / S / D

$750
Flat fee · homes up to 3,000 sq ft
  • Manual J — room-by-room load calculation
  • Manual S — equipment sizing and selection
  • Manual D — duct design and sizing
  • Formatted for Arizona plan review
  • Revisions included if the city comments
Energy code

ResCheck

$500
Flat fee
  • Residential energy code compliance report
  • Envelope, insulation, and fenestration review
  • Signed compliance certificate
  • Formatted for Arizona plan review
  • Revisions included if the city comments

What happens after you pay

  1. You'll get a QuickBooks receipt by email immediately.
  2. Email your plans to kris@sokodesigns.com — floor plans and elevations are usually enough. Include the jurisdiction.
  3. We confirm receipt and give you a turnaround date, usually same or next business day.

Not sure your project fits the flat fee? Ask first — we'll confirm before you pay. If a home turns out to be over 3,000 sq ft after payment, we'll quote the difference or refund you in full.

Over 3,000 sq ft, commercial, or something unusual? Send us the plans and we'll quote it — multifamily, tenant improvements, additions to existing systems, and anything that needs a custom scope. Quotes usually come back same or next business day.
What you're getting

The paperwork the city asks for.

Most Arizona jurisdictions won't issue a permit on new construction or a mechanical change-out without these. Here's what each one does.

J

The load calculation

Works out how much heating and cooling the building actually needs, room by room — based on orientation, insulation, windows, and local design temperatures.

S

The equipment sizing

Takes the Manual J numbers and selects equipment that matches them. This is what stops a house from getting a wildly oversized unit that short-cycles.

D

The duct design

Sizes the duct runs and registers so the air the equipment moves actually reaches the rooms that need it, at the right volume.

How it works

Send plans, get a report.

1

Send your plans

Floor plans and elevations are usually enough. Tell us the jurisdiction so we format it the way that reviewer expects.

2

We prepare it

We run the calculations and produce the stamped report set, ready to drop into your permit submittal.

3

You submit

If the city comes back with comments on the energy documents, we handle the response — that's included.

Request a report

Tell us about the project.

Send the address, square footage, and plans. We'll confirm the price and the turnaround — and if it's outside the flat-fee range, we'll quote it.