We take churches, daycares, and private schools into commercial space the right way: zoning use permit first, then a permit-ready set for assembly and classroom occupancy, exits, sprinklers, restrooms, and licensing layouts. Submitted to your city and corrected through approval. Flat price, quoted within one business day.
Tell us where the building is and what you're opening. We'll show you exactly who reviews a church, daycare, or school in that city, email you the checklist of what to have ready, and call with a flat price.
We only permit buildings in Maricopa County, Arizona. Working local is how we keep the city submittals fast and the prices flat. Typed the wrong ZIP? Try again below.
Building is in Maricopa County but the ZIP didn't take? Call 480-660-3133.
We'll call within one business day. Your checklist of what to have ready is on its way to your inbox. If the lease is already running, call now and we'll move you up.
Occupant load drives nearly everything in an assembly build-out: how many exits, whether sprinklers are required, how many restroom fixtures, even the door hardware. Slide to your seat count and see what the drawings will have to show.
Typical triggers for an assembly occupancy. We confirm the exact numbers for your building and city.
Assembly and educational uses have a step most tenants don't: the city has to agree the use belongs on that property at all. Skip it and the best drawings in the Valley sit in a drawer. We put it first.
Is the use allowed here, and does it need a use permit or a hearing? Parking count confirmed.
Sanctuary or main room, platform, classrooms, nursery, restrooms, fellowship. Occupant load set.
Exits and panic hardware, sprinkler and alarm scope, restrooms, accessibility, MEP, finishes.
Submitted through your city's portal. We answer every correction.
Building and fire sign-offs, Certificate of Occupancy for the new use.
Arizona DHS visit for childcare, drawn to pass. Doors open.
Every one of these is resolved before the set goes in. That's the difference between opening on schedule and a congregation meeting in a borrowed gym for another season.
Churches, daycares, and schools often need a use permit in commercial and industrial zones, sometimes with a hearing. Weeks to months, so it goes first.
ZoningRetail, office, or warehouse to assembly or educational is the biggest jump in the code. New occupant load, exits, restrooms, and often sprinklers.
OccupancyAssembly spaces at roughly 300 occupants, and most daycares, require sprinklers and alarms. If the building doesn't have them, that's the budget conversation to have first.
FireTwo exits above 49 occupants, three above 500, doors swinging out with panic bars, and travel distance measured across the whole floor.
Life safetyEducational and daycare rooms carry their own occupancy, exit, and separation rules, plus Arizona DHS licensing standards for childcare. Drawn to both.
Educational + DHSAssembly fixture counts climb fast with seats, and accessible route, seating, and the platform are checked on every set.
Plumbing + ADA
A nonprofit education and vocational campus brought into commercial space: classrooms and training rooms with their own occupancy, exits, and separation, taken through city review with the questions a school build-out always raises answered in the first submittal.
Two steps, about a minute. Or skip the form and call. We answer, and we'll tell you straight what the permit path looks like.