Warehouse, flex & industrial build-outs · Phoenix metro

The dock is yours.The permit isn't.Let's get you operating.

We draw permit-ready warehouse and industrial sets: racking and high-piled storage packages, mezzanines, office build-outs inside the warehouse, dock and electrical changes. Then we submit to your city and the fire department and answer every correction. Flat price, quoted within one business day.

0+Projects permitted
0+AZ jurisdictions
0hrSite visits
Start here

Two steps. Then we take it from here.

Tell us where the building is and what you're moving in. We'll show you exactly who reviews a warehouse build-out in that city, email you the checklist of what to have ready, and call with a flat price.

  • High-piled storage handled with the building permit. Racking over 12 feet is its own fire-department review. We file both together so one doesn't wait on the other.
  • Mezzanines engineered and egressed. Structural, stairs, guards, and the one-third rule, drawn as part of the same set.
  • Office-in-a-warehouse done right. Separation, restrooms for the headcount, HVAC for the conditioned area, accessible route from the lot.
  • We submit, track, and answer every comment. You get status updates without chasing a plan reviewer.
📞480-660-3133Rent already running? Call first.

Get a flat-price quote

About a minute. No obligation.

Step 1 of 2 · The building
Enter the 5-digit ZIP of the building
Pick one
Pick one
Pick one
Maricopa County buildings only.
Prefer to talk? 480-660-3133
Step 2 of 2 · About you
Required
Required
Required
No obligation. We don't sell your information.
●

That one's outside our area.

We only permit buildings in Maricopa County, Arizona. Working local is how we keep the city submittals fast and the prices flat. Typed the wrong ZIP? Try again below.

Building is in Maricopa County but the ZIP didn't take? Call 480-660-3133.

✓

Got it. Thank you.

We'll call within one business day. Your checklist of what to have ready is on its way to your inbox. If rent is already running, call now and we'll move you up.

Your permit path

Your warehouse

    We run all of this for you. This is just so you know what's coming.
    Call now: 480-660-3133
    Rack & mezzanine check

    Twelve feet is the number that changes everything.

    Below it, racking is an engineering sheet and an anchor detail. Above it, the fire code calls it high-piled storage and the fire department wants its own review: commodity class, aisle widths, sprinkler density, smoke venting. Slide to your rack height and see which permits show up.

    Typical triggers under the International Fire Code as adopted in Maricopa County cities. We confirm for your building and commodity.

    High-piled storage permit (fire dept)Required
    Engineered racking drawingsRequired
    Occupancy the city will assignS-1 storage
    High-piled storage applies to combustible storage above 12 feet (6 feet for some high-hazard commodities). Mezzanines are limited to one-third of the room they sit in.
    How a warehouse gets permitted

    Two reviewers, filed together.

    A warehouse build-out is a building permit and, more often than tenants expect, a fire department package for the racking. Filed in sequence, the second waits on the first. Filed together from one coordinated set, they run side by side.

    1

    Building check

    Sprinkler system, clear height, dock doors, power, and the occupancy the building was built for.

    2

    Layout

    Racking, aisles, office, mezzanine, exits across the floor. You approve it before details.

    3

    Drawings

    Floor plan, office build-out, MEP, structural for mezzanine and racking, exit signage.

    4

    City permit

    Submitted through your city's portal. We answer every correction.

    5

    Fire package

    High-piled storage and racking review, filed at the same time as the city.

    6

    Operate

    Inspections, Certificate of Occupancy, forklifts rolling.

    What the city and fire department will ask for

    The six things that generate warehouse corrections.

    Every one of these is classified, drawn, and detailed before the set goes in. That's the difference between a first-submittal approval and inventory sitting in a trailer.

    High-piled storage

    Combustible storage above 12 feet means a fire department review of commodity class, aisle widths, sprinkler density, and smoke venting. Its own permit, run alongside the building permit.

    Fire code

    Racking engineering

    Seismic anchorage, load plaques, and engineered drawings for the uprights, even under 12 feet in most Valley cities.

    Structural

    Mezzanines

    Structural engineering, stairs and guards, egress from the platform, and the one-third floor-area rule. Exceed it and it's a second story with sprinkler consequences.

    Structural + egress

    Office inside the warehouse

    Business occupancy inside storage or factory space: separation, restrooms for the headcount, HVAC for the conditioned area, and an accessible route from parking.

    Occupancy

    Docks, doors & exits

    Exit access across a racked floor, exit signage, extinguisher placement, and dock changes that touch the structure or the fire lane.

    Life safety

    Hazardous materials & process

    Paint, solvents, compressed gas, welding, or lithium batteries move the space from storage to factory or hazardous occupancy and bring maximum-allowable-quantity rules.

    Fire + occupancy
    Recent industrial work

    Spaces we got permitted and operating.

    Magellan Aerospace
    Magellan Aerospace · Phoenix metro

    Magellan Aerospace, Phoenix metro

    An aerospace manufacturing tenant improvement: factory occupancy, process equipment, and the electrical and mechanical changes that come with it, taken through city review with the fire department's questions answered up front.

    • Classified correctly from day one. Factory, not storage, which changes separation, ventilation, and exits.
    • Equipment loads on the electrical sheet, not discovered at inspection.
    • Corrections answered in days, not review cycles.

    See more tenant improvement work →

    Magellan Aerospace Tunnel to Towers Foundation The Golf Reserve The Cocky Rooster
    Questions

    What warehouse tenants ask us.

    In most Valley cities, yes. Racking over a few feet needs engineered drawings and anchor details, and above 12 feet of storage it becomes a high-piled storage review with the fire department. The racking vendor's layout is a great start; it isn't a permit set.
    It covers what the building was designed for. Tall racks of a different commodity can exceed what the existing sprinkler density protects, and the fire department will ask. We check the sprinkler drawings against your storage before you buy racks that need a system upgrade.
    Drafting is typically two to four weeks depending on whether there's an office build-out and a mezzanine. City review runs a few weeks to a couple of months; the fire package runs alongside it when filed together. A complete first submittal is what keeps the fire review from becoming a second round.
    Yes, and it's one of the most common industrial TIs. The office is a different occupancy inside the storage space, so it brings separation, restroom counts for the headcount, HVAC for the conditioned area, and an accessible route. All of it is routine when drawn in from the start.
    Not a problem, but it's a different permit. Those materials bring maximum-allowable-quantity limits and can shift the occupancy to factory or hazardous. Tell us what and how much on the form and we'll classify it correctly before drawing, which is far cheaper than finding out at inspection.
    It depends on whether there's racking, a mezzanine, and an office build-out, so we quote it after a site visit. It's a flat number you approve before we start. City and fire permit fees are separate and go to them, not to us.
    Not on this side of the business. SOKO Designs does the plans and the permitting, so we're never competing with your contractor. If you don't have one, tick the box on the form and we'll introduce you to GCs from our network who do industrial build-outs in the Valley.
    Stop paying rent on an empty floor

    Tell us about the building.

    Two steps, about a minute. Or skip the form and call. We answer, and we'll tell you straight what the permit path looks like.